TUCSON, ARIZONA. On a Friday morning in late April, protesters gathered at 7 a.m. outside the construction site of Project Blue, a proposed $3.6 billion data centre near the Pima County Fairgrounds. In May, the city revoked the project’s construction water meter after unauthorised use of city water was identified. Earlier, Tucson officials had declined to provide land, water and power support, so the developer switched to air and closed-loop cooling instead of drawing on city water. That did not end the argument. Residents pointed out that cooling with less water usually means using more electricity, which moves the burden elsewhere rather than removing it. A second scheme worth $5 billion near Marana faced similar opposition. By late June, Arizona had become the clearest example of a question the energy community kept returning to in H1 2026: not how much water AI needs, but where projects can actually run.

SILICON VALLEY AND REDMOND, JUNE. The largest operators answered with numbers. On 3 June, Google set out five water stewardship commitments, including replenishing more water than its data centres consume by 2030. It also noted the trade-off Tucson residents had raised: in many locations, water cooling can cut cooling electricity by around 10% compared with air cooling. Kate Brandt, Google’s chief sustainability officer, put it this way: “how we build is just as important as what we build.” On 24 June, Microsoft reported that its water use effectiveness had fallen from 2.3 litres per kWh in its earliest data centres to 0.27 litres per kWh in 2025, and that around 90% of its owned fleet used low- or zero-water cooling. “Over the past two decades, we’ve reduced water use intensity by nearly 90%,” wrote chief sustainability officer Melanie Nakagawa. Better efficiency does not guarantee lower total use, however, when the fleet itself keeps growing.


FRANCE, LATE JUNE. Water also constrains the power stations that supply data centres. During Europe’s June heatwave, warm rivers and low flows forced French reactors including Golfech 2, Bugey 3 and Nogent 1 to shut down or cut output, and about 4.1 GW of nuclear capacity was curtailed by 24 June. Other low-carbon technologies depend on water too. A review published on 22 May found that electrolysis needs at least 9 litres of purified water for every kilogram of hydrogen, and more once cooling is counted. The IEA’s Global Energy Review 2026 found that drought had held back hydropower in several regions in 2025, increasing reliance on fossil fuels.

Unlock Full Access to this Insight

To continue reading this briefing and explore deeper insights, register for access to our Energy Insights Portal. Inside, you’ll find:

  • Extended editorial briefings with in-depth analysis and empirical data drawn from 5,000 of the world’s most influential commentators on the energy industry on key issues shaping the energy sector.
  • Monthly and quarterly data identifying and tracking how energy industry leaders are engaging with critical topics.
  • In depth research explaining why energy industry leaders are engaging with these key issues and providing the context and framework for further exploration.
  • Quantitative primary research conducted with responses from energy industry leaders on our panel, providing unique answers to the issues affecting the global energy industry.
  • Power BI dashboards offering dynamic exploration of 5,000 energy key opinion leaders, social and digital narrative analysed against 14 strategic and tactical energy industry metrics.
  • Expert interpretation of what these issues really mean to the industry and what decisions can be taken on the back of unprecedented empirical evidence.

Please to access exclusive research and data-driven analysis.

Power Meets Water: Could Water Availability Constrain the Next Data Centre and Infrastructure Boom? - Quarter 2 2026

Case for tracking:

Water is becoming an increasingly important part of the energy-security story. AI and data centres need both huge amounts of electricity and water for cooling, while electricity generation itself can depend heavily on water. This means that as AI power demand grows, pressure is not only increasing on electricity grids but also on local water supplies – particularly in already water-stressed regions.

The Iran war made this relationship much more visible. Across the Gulf, millions of people depend on energy-intensive desalination plants for drinking water, and the conflict put some of this infrastructure directly at risk. Facilities in Kuwait and the UAE suffered indirect damage early in the conflict, while desalination infrastructure in Bahrain and Iran was reportedly attacked. Iran itself entered the war already facing severe drought and declining water supplies, making damage to desalination plants and pipelines even more significant.

The risk also spread beyond the Middle East. In April, U.S. agencies warned that Iran-affiliated cyber actors were targeting operational technology across water, wastewater and energy infrastructure, showing that water systems can become part of a wider geopolitical conflict even thousands of miles away. The story to track is therefore becoming much bigger than data-centre cooling: can countries secure enough water and energy for AI, cities and industry while protecting the infrastructure connecting the two from drought, physical attacks and cyber threats?

Volume of Mentions from Energy Considered’s Key Opinion Leaders:

Unlock Full Access to this Insight

To continue reading this briefing and explore deeper insights, register for access to our Energy Insights Portal. Inside, you’ll find:

  • Extended editorial briefings with in-depth analysis and empirical data drawn from 5,000 of the world’s most influential commentators on the energy industry on key issues shaping the energy sector.
  • Monthly and quarterly data identifying and tracking how energy industry leaders are engaging with critical topics.
  • In depth research explaining why energy industry leaders are engaging with these key issues and providing the context and framework for further exploration.
  • Quantitative primary research conducted with responses from energy industry leaders on our panel, providing unique answers to the issues affecting the global energy industry.
  • Power BI dashboards offering dynamic exploration of 5,000 energy key opinion leaders, social and digital narrative analysed against 14 strategic and tactical energy industry metrics.
  • Expert interpretation of what these issues really mean to the industry and what decisions can be taken on the back of unprecedented empirical evidence.

Please to access exclusive research and data-driven analysis.